- The material 3, and 4 categories with excavation
parallel road to transport the 5,000 m STD 'for Irad embankment loop:
- the mass profile 63014.00
- in the material 4 to 6 categories
to transport the 10,000 m STD 'from site to:
- Excavation of a parallel road to the highway embankment and loop
- to
189,041.00 profile mass transport with the STD 13,000 meter, excavation of borrow pits "Staničenje":
- the mass profile 110,911.00